A mark is useful only when it belongs to the correct part and revision, remains readable after finishing and does not impair function. Mark zone, data, location control and verification should be defined before production.
Define the purpose and traceability level
Separate part number, revision, lot, serial number and inspection status. Store only necessary data and define which system creates, verifies and retains each code relationship.
Choose a mark zone away from functional surfaces
Avoid seals, datums, clamp areas, thin edges and critical cosmetic faces. The drawing should define available area, reading orientation and edge clearance.
Coordinate marking with surface treatment
Marking before or after anodizing, plating or heat treatment changes contrast and depth. Trial pieces confirm that the finish will not hide or corrode the mark.
Use location control and verify readability
A foolproof nest holds position and orientation. After marking, visual or scanner checks compare data with the work order, and mismatched parts are contained before release.